Friday, February 24, 2017

Concrete and floor leveling

A typical bungalow in Etobicoke can have as much as a 2" difference in height between the low spots near drains and the high spots near the edges of the block walls.  We've managed to make nice compromises on cost (ie not leveling out the whole basement) and performance.  Below, we are pouring the concrete for the new washroom, while we will use a bunch of hand mix floor levelling bags on the section next to this at the bottom of the stairs.  For the price, it's going to work out really well.


No comments:

Post a Comment